{"id":4967,"date":"2015-09-24T15:08:15","date_gmt":"2015-09-24T19:08:15","guid":{"rendered":"https:\/\/wordpress.fau.edu\/oit\/?p=4967"},"modified":"2015-09-24T15:08:15","modified_gmt":"2015-09-24T19:08:15","slug":"oit-wireless-wifi-installationexpansion-davie-campus","status":"publish","type":"post","link":"https:\/\/wordpress.fau.edu\/oit\/2015\/09\/oit-wireless-wifi-installationexpansion-davie-campus\/","title":{"rendered":"OIT Wireless WIFI Installation\/expansion @ Davie Campus"},"content":{"rendered":"<p>OIT Contractors Working At the Davie Campus<br \/>\n======================================<\/p>\n<p>OIT is continuing it\u2019s efforts to expand and strengthen the wireless signal at the Davie campus. Our contractor (Jade Communications) will be at different parts of the Davie Campus starting on Friday, September 25th. More specifically, you will see technicians in accordance to the following schedule:<\/p>\n<p><strong>Friday, September 25th to Tuesday, September 29 | ES Building:<\/strong><\/p>\n<ul>\n<li>First floor &#8211; Hallways 100A and 100B.<\/li>\n<li>Second floor &#8211; Hallways 200w, 200t, 200k and 200i.<\/li>\n<li>Third floor \u2013 Hallways 301E,301D.<\/li>\n<\/ul>\n<p><strong>Wednesday, September 30 | Student Union Building:<\/strong><\/p>\n<ul>\n<li>Second floor &#8211; 200B, 203 and Hallway 200C.<\/li>\n<\/ul>\n<p><strong>Thursday, October 1, to Friday October 9 | Liberal Arts Building<\/strong><\/p>\n<ul>\n<li>4th floor. Hallway 403i, 406, 403D,403F.<\/li>\n<li>2nd \u2013 3rd floor. Hallway 324, 329, Rooms 303D, 303F.<\/li>\n<li>3rd \u2013 2nd floor. Hallways 211, 232, Room 244.<\/li>\n<li>4th \u2013 1st floor. Hallways 102, 126, 135, Rooms 112C , 114, 160.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>OIT Contractors Working At the Davie Campus ====================================== OIT is continuing it\u2019s efforts to expand and strengthen the wireless signal at the Davie campus. Our contractor (Jade Communications) will be at different parts of the Davie Campus starting on Friday,<span class=\"ellipsis\">&hellip;<\/span><\/p>\n<div class=\"read-more\"><a href=\"https:\/\/wordpress.fau.edu\/oit\/2015\/09\/oit-wireless-wifi-installationexpansion-davie-campus\/\">Read more &#8250;<\/a><\/div>\n<p><!-- end of .read-more --><\/p>\n","protected":false},"author":60,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/wordpress.fau.edu\/oit\/wp-json\/wp\/v2\/posts\/4967"}],"collection":[{"href":"https:\/\/wordpress.fau.edu\/oit\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wordpress.fau.edu\/oit\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wordpress.fau.edu\/oit\/wp-json\/wp\/v2\/users\/60"}],"replies":[{"embeddable":true,"href":"https:\/\/wordpress.fau.edu\/oit\/wp-json\/wp\/v2\/comments?post=4967"}],"version-history":[{"count":2,"href":"https:\/\/wordpress.fau.edu\/oit\/wp-json\/wp\/v2\/posts\/4967\/revisions"}],"predecessor-version":[{"id":4970,"href":"https:\/\/wordpress.fau.edu\/oit\/wp-json\/wp\/v2\/posts\/4967\/revisions\/4970"}],"wp:attachment":[{"href":"https:\/\/wordpress.fau.edu\/oit\/wp-json\/wp\/v2\/media?parent=4967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wordpress.fau.edu\/oit\/wp-json\/wp\/v2\/categories?post=4967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wordpress.fau.edu\/oit\/wp-json\/wp\/v2\/tags?post=4967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}