Completed – IRM Systems Maintenance, May 26, 2011 from 3:00AM to 7:00AM

IRM will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deem necessary, installing critical patches and other health checks on Thursday, 05/26/2011 from 3:00 AM to 7:00 AM during IRM maintenance window.  In addition, the following systems will be specifically impacted:

When: 6:00 AM – 6:30 AM

Affected Systems: Banner Production – No downtime expected

Description of Maintenance: Financial Aid patch will be installed in Banner production (FAUP) tomorrow morning.  All related applications will remain available

==========================================

When: 6:00 AM – 7:00 AM

Affected Systems: Blackboard – No downtime expected

Description of Maintenance: A Building Block will be installed on Blackboard for a new Known Issues Module

=========================================

When : 3:00 AM – 4:00 AM

Affected Systems: Network Registration DHCP and LDAP servers

Affected Services: Network Registration DHCP Clients

Description of Change: The DHCP ranges for wired and wireless DHCP on the Network Registration server subnets will be modified to provide separate pools for fixed-address clients.  There should be no downtime experienced during these changes.

=========================================

When : 3:00 AM – 4:00 AM

Affected Systems:

Spwfe2

Bbpproxy1

Owlapp2

App1

Affected Services:

SharePoint

Blackboard

Owlapp

Description of Change: We will be migrating the above systems to another VM host while we perform a reboot of HVBOC03. There will be momentary downtime.

Posted in Uncategorized

Resolved – FAU Network slow

The FAU network is experiencing high levels of packet loss (slowness.) We are working to resolve the issue.

Posted in Network and Telecom