Switch upgrades for the 3rd and 4th floor of the Davie Campus Education & Science (ES) building are completed.
The 1st floor switch upgrade of the building is postponed until a later date.
Switch upgrades for the 3rd and 4th floor of the Davie Campus Education & Science (ES) building are completed.
The 1st floor switch upgrade of the building is postponed until a later date.
The exchange 2010 mailbox servers will be rebooted on Saturday July 2nd at 2am to correct a recent problem. Users will be momentarily disconnected from Outlook and/or mobile devices at this time and will automatically reconnect within 5 to 10 minutes.
Network: Completed – Network upgrades in building 47 completed.
The network maintenance in building 47 2nd floor is complete. Thank you.