Resolved – Network outage portion of Boca Raton campus

Network connectivity has been restored to all buildings on the Boca Raton Campus.

Thank you

Posted in Uncategorized

Update – Network outage portion of Boca Raton campus

Network outage update: 97 CU – CULTURE AND SOCIETY = outage due to partial loss of building power 38 GY – ARENA = outage due to partial loss of UPS power

Network connectivity has been restored to the following buildings:

10 AD – KENNETH R. WILLIAMS ADMINISTRATION BUILDING = Network restored 36 EG – ENGINEERING WEST = Network restored 44 SO – SOCIAL SCIENCE BUILDING = Network restored 81 PK – PARKING GARAGE I= Network restored 84 NU – CHRISTINE E. LYNN COLLEGE OF NURSING= Network restored

Thank you.

Posted in Network and Telecom

Network outage portion of Boca Raton campus

There is currently a network outage on a portion of the Boca Raton campus as a result of the extended power outage.

10 AD – KENNETH R. WILLIAMS ADMINISTRATION BUILDING (partial outage) 36 EG – ENGINEERING WEST 38 GY – ARENA 44 SO – SOCIAL SCIENCE BUILDING 81 PK – PARKING GARAGE I 84 NU – CHRISTINE E. LYNN COLLEGE OF NURSING 97 CU – CULTURE AND SOCIETY

We are currently working to restore service to all buildings

Thank you.

Posted in Uncategorized

Update – Power Outage on Campus beginning at 1:55am

Power has been restored as of 3:05am.

Posted in Uncategorized

Power Outage on Campus beginning at 1:55am

There was a Power Outage on Campus beginning at 1:55am. Utilities has been in touch with FPL. No ETA at this time

Posted in Uncategorized

OIT Systems Maintenance, Tuesday, July 30 from 7:00 PM to 10:00 PM

The Office of Information Technology will be performing routine systems maintenance on Tuesday, 07/30/2013 from 7:00 PM to 10:00 PM.  The following systems will be specifically impacted:

When: 07/30/2013, 7:00pm to 10:00pm
Affected Services: Banner test and development, IDM test and development, Report Caster test, Blackboard test and development, Luminis test, Middleware test instance.
Affected Systems: banoradev, modena, bbloraclealt, boc22ora02, boc22ora04.
Reason: Quarterly Oracle database patch set updates and host patch installations
User Impact: Services listed may be temporarily unavailable during the window.

Posted in Banner and Admin Systems, Educational Technologies, Email, Network and Telecom, Systems

Completed – Firewall maintenance, Saturday July 27 from 5:00 AM to 7:00 AM

The network and firewall maintenance has been completed.

Thank you

Posted in Educational Technologies, Systems

Correction Notice: Notice of (current) Status of Appointment and Payroll Remittance Advice​

University Community,

An upgrade to the email virus scanning software caused [WARNING: MESSAGE ENCRYPTED] to be prepended to the subject of emails containing password protected attachments. We have confirmed that this notice was prepended to the following messages:

Notice of (current) Status of Appointment

Payroll Remittance Advice

These emails and the associated attachments are safe to open. This warning has been disabled for future messages. We apologize for any confusion this may have caused.

 
Office of Information Technology.

The authenticity of this message can be validated at the OIT websites under status updates.

 

Posted in Network and Telecom

Firewall maintenance, Saturday July 27 from 5:00 AM to 7:00 AM

Please be advised that a modification to the Internet firewall must be made between 5:00 am and 7:00 am on Saturday July 27, 2013. This change will cause intermittent interruptions to the Internet across all FAU campus locations between 5:00 am and 7:00 am.

If you experience network difficulties after the times outlined above, please contact the FAU help desk at https://helpdesk.fau.edu or 561-297-3999 for immediate assistance.

Thank you

Posted in Uncategorized

Completed Network Maintenence Bldg 86 (College of Business) 7/22 to 7/26

Work Completed. Starting Monday 7/22 Networking Department will be upgrading the network equipment in building 86 room 216 the College of Business building. The work will be done from 4:00am to 7:00am daily until all interface ports have been moved to the new equipment. All work will be completed by Friday 7/26. This work only affects the rooms on the 1st and 2nd floors. The Trading room 101 and 101A will not be affected by this work.

Posted in Uncategorized