Completed – IRM Systems Maintenance, April 12, 2011 from 1:00AM to 7:00AM

IRM will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deem necessary, installing critical patches and other health checks on Thursday, 05/12/2011 from 1:00 AM to 7:00 AM during IRM maintenance window.  In addition, the following systems will be specifically impacted:

When: 1:00 AM – 7:00 AM

Affected Services:  Blackboard 9.1 Production

Affected Systems: Solaris Zones: BP1 – BBP7 and COLLAB servers

Description of Maintenance: The Blackboard 9.1 production will be upgraded to Service Pack 5. Blackboard will be unavailable from 1:00 AM to 7:00AM

==============================================

When: 4:00 AM to 5:00AM

Affected Systems: Banner Production

Affected Services:

INB

SSB

Travel

EFC

Workflow

Job submission

Posting

Description of Maintenance: Banner production will be unavailable on Thursday May 12 from 4:00am-5:00am to apply patches for a problem that was discovered last week.

==============================================

When: 6:00am-7:00am

What: Financial Aid 8.11 upgrade

Affected: Financial aid users

============================================

When : 3:00 AM – 6:00 AM

Affected Systems:  DNS

Nsboc0.fau.edu, Nsboc1.fau.edu, Nsdav1.fau.edu, Nsftl1.fau.edu, Nsjup1.fau.edu, Nspsl1.fau.edu

Affected Services: DNS

Description of Change: We will be adding the following DNS zones to above name servers: bocnode1.voip.fau.edu, bocnode2.voip.fau.edu, davproxy.voip.fau.edu, hbproxy.voip.fau.edu, voip.fau.edu.

==============================================

When : 3:00 AM – 6:00 AM

Affected Systems: SharePoint

Spapp1.fau.edu

Affected Services: SharePoint

Description of Change: We will be moving the virtual machine to a new host (hvboc02).

==============================================

Posted in Banner and Admin Systems