At 5:10 pm we experienced a hardware failure on the Harbor Branch campus which affected buildings 04, 16, 18, 34, and 37. The replacement hardware is now in production and the network has been restored.
Thank you
At 5:10 pm we experienced a hardware failure on the Harbor Branch campus which affected buildings 04, 16, 18, 34, and 37. The replacement hardware is now in production and the network has been restored.
Thank you
OIT will be performing maintenance on Monday, May 25 from 12:01 a.m. until 6:00 a.m. Due to the nature of the maintenance, users may experience intermittent network outages lasting approximately 15 – 20 minutes during this window. This outage will affect connectivity to the Internet as well as connectivity within FAU.
The network maintenance has been completed.
Thank you
The network maintenance scheduled for Wednesday, May 06, 2015 has been completed. Network maintenance will resume on Friday, May 08 at 2:00 am.
Thank you
The Networking department will be performing maintenance on Wednesday, May 6 and Friday, May 8 from 12:01 a.m. through 6:00 a.m. Due to the nature of the maintenance, users may experience intermittent network outages lasting approximately 10 – 15 minutes during this window. This outage will affect connectivity to the Internet as well as connectivity within FAU.
Thank you
The network outage in buildings T-10 and T-11 has been resolved.
Thank you
We are currently experiencing a network outage that is affecting buildings T-10 and T-11 on Boca Raton campus. We are working to resolve the issue as soon as possible.
Thank you
We experienced a network outage on the Jupiter campus due to a power outage in building MC-04 at 1:44 pm. The power and the network have been restored.
Thank you
The issue with the FAU telephone system has been resolved.
Thank you
We are experiencing intermittent telephone line outages. For a quick resolution, please submit extension numbers that are experiencing an outage. The equipment vendor is on site to help correct the issue.
Thank you