Network: Completed – Network upgrades in building 47 completed.
The network maintenance in building 47 2nd floor is complete. Thank you.
Network: Completed – Network upgrades in building 47 completed.
The network maintenance in building 47 2nd floor is complete. Thank you.
IRM will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deem necessary, installing critical patches and other health checks on Thursday, 05/12/2011 from 1:00 AM to 7:00 AM during IRM maintenance window. In addition, the following systems will be specifically impacted:
When: 1:00 AM – 7:00 AM
Affected Services: Blackboard 9.1 Production
Affected Systems: Solaris Zones: BP1 – BBP7 and COLLAB servers
Description of Maintenance: The Blackboard 9.1 production will be upgraded to Service Pack 5. Blackboard will be unavailable from 1:00 AM to 7:00AM
==============================================
When: 4:00 AM to 5:00AM
Affected Systems: Banner Production
Affected Services:
INB
SSB
Travel
EFC
Workflow
Job submission
Posting
Description of Maintenance: Banner production will be unavailable on Thursday May 12 from 4:00am-5:00am to apply patches for a problem that was discovered last week.
==============================================
When: 6:00am-7:00am
What: Financial Aid 8.11 upgrade
Affected: Financial aid users
============================================
When : 3:00 AM – 6:00 AM
Affected Systems: DNS
Nsboc0.fau.edu, Nsboc1.fau.edu, Nsdav1.fau.edu, Nsftl1.fau.edu, Nsjup1.fau.edu, Nspsl1.fau.edu
Affected Services: DNS
Description of Change: We will be adding the following DNS zones to above name servers: bocnode1.voip.fau.edu, bocnode2.voip.fau.edu, davproxy.voip.fau.edu, hbproxy.voip.fau.edu, voip.fau.edu.
==============================================
When : 3:00 AM – 6:00 AM
Affected Systems: SharePoint
Spapp1.fau.edu
Affected Services: SharePoint
Description of Change: We will be moving the virtual machine to a new host (hvboc02).
==============================================
The course recordings have been recovered and we are now double checking all links in Blackboard to ensure all has been recovered accurately and correcting any problems that we find. This process should be completed soon.
We will be performing a restart of the MyFAU system at 3:30a to activate better monitoring tools for the portals. The restart takes about 20 mins so the system will be back up by 4am. LDAP will not be affected.