IRM will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deem necessary, installing critical patches and other health checks on Thursday, 06/1/2011 from 3:00 AM to 7:00 AM during IRM maintenance window. In addition, the following systems will be specifically impacted:
What: Production hyper-v storage reconfiguration When: 5am-7am Affected: Users that connect the following servers:
– WUS
– ADCON
– ISSDEV
– FAUWEBDEV
– FAUAPPSRV1
– ECSWINS01
– ECSWINS02
– ACSMEM04
================================================== When: 4:00 AM – 6:00 AM Affected Services: Blackboard 9.1 Production Affected Systems: Solaris Zones: BP1 – BBP7 and COLLAB servers Description of Maintenance: The Blackboard 9.1 production servers will be updated with the following patches to fix minor issues with the application.
AS-159093 – multiple footers issue AS-159210 – calendar day alignment issue AS-159092 – mycalendar format issue
Each server will require a PushConfigUpdates.sh script to run to make the changes effective.
==================================================