Completed – IRM Systems Maintenance, June 2, 2011, from 3:00AM to 7:00AM

IRM will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deem necessary, installing critical patches and other health checks on Thursday, 06/1/2011 from 3:00 AM to 7:00 AM during IRM maintenance window. In addition, the following systems will be specifically impacted:

What: Production hyper-v storage reconfiguration When: 5am-7am Affected: Users that connect the following servers:

– WUS

– ADCON

– ISSDEV

– FAUWEBDEV

– FAUAPPSRV1

– ECSWINS01

– ECSWINS02

– ACSMEM04

================================================== When: 4:00 AM – 6:00 AM Affected Services: Blackboard 9.1 Production Affected Systems: Solaris Zones: BP1 – BBP7 and COLLAB servers Description of Maintenance: The Blackboard 9.1 production servers will be updated with the following patches to fix minor issues with the application.

AS-159093 – multiple footers issue AS-159210 – calendar day alignment issue AS-159092 – mycalendar format issue

Each server will require a PushConfigUpdates.sh script to run to make the changes effective.

==================================================

Posted in Uncategorized