Completed – Switch Upgrades Computing Center

Networking will be performing upgrades on switches in the Computing Center, Room 102 during the maintenance window Thursday 06/30/2011 as follows:

Rack # – Switch ID – Upgrade to be done

RU10 – boc22cm102sw847 – IOS Upgrade and reboot

RU10 – boc22cm102sw849 – IOS Upgrade and reboot

RU11 – boc22cm102esw846 – IOS Upgrade and reboot

The switch reboot after IOS Upgrade will cause an interruption of network connectivity to all systems connected to these switches.

These upgrades will begin at 4:30am and be complete by 6:00am.

Posted in Uncategorized

Completed – IRM Systems Maintenance, Thursday, June 30, 2011, from 3:00 AM to 7:00 AM

IRM will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deem necessary, installing critical patches and other health checks on Thursday, 6/30/2011 from 3:00 AM to 7:00 AM during IRM maintenance window. In addition, the following systems will be specifically impacted:

When: 12:01 AM to 7:00 AM
Affected Services: Banner production (FAUP) Description of Maintenance: Banner production (FAUP) will be unavailable from 12:01 AM to 7:00 AM in order to complete the Phase I of the fiscal year end roll process.

====================================

When: 3:00 AM – 3:30 AM
Affected Services: Blackboard
Affected Systems: Bbpproxy2 Bbpproxy1
Description of Maintenance: We will be applying a configuration change to the web servers to allow Office docs to open in Blackboard without prompting for credentials.

===================================

Posted in Network and Telecom