Banner Finance 8.6 upgrade will be installed in Banner production FAUP this Thursday morning (10/13/2011) between 3:00am – 7:00am.
Banner Finance 8.6 upgrade
Blackboard intermittently available
Blackboard is currently having intermittent problems. We expect the problem to be resolved by 9:30am.
Employee SSB 8.5 upgrade + patches this Friday morning
Employee SSB 8.5 upgrade plus patches, Position Control 8.5 patches and HR/Payroll 8.5 patches will be installed in Banner production FAUP this Friday (10/7/2011) morning between 3:00am – 7:00am.
This extended production maintenance window is due to the ODS 8.2 upgrade which is scheduled to be installed in production this Thursday (10/6/2011) morning between 3:00am – 7:00am.
[RESOLVED] Talisma unavailable @ 2:30pm
Talisma will be unavailable starting at 2:30 pm while we add additional storage to the backend server.
– Talisma is now available
Banner production maintenance this Thursday 9/29/2011 1am-7am
Banner Financial Aid 8.12 is scheduled to be installed in production FAUP this Thursday morning from 1:00am – 7:00am. There is a possibility that the database may be rebooted during this time. Please deactivate any AppWorx jobs that are scheduled to run at that time. Thanks.
Resolved – SQL Server (sql05vs) down
SQL Server instance SQL05VS was unavailable between 3AM and 8AM.
The issue has been resolved and the instance is currently available