Out of Maintenance Window OIM Restart – 1/9/2017

OIM will be restarted at approximately 10:00am this morning to address severe load and latency that is ultimately impacting a variety of services.

The downtime is roughly ten minutes.

This would impact the following:

Password Changes, Account Claiming, and New Hires from Workday.

Posted in Banner and Admin Systems, Systems

[Completed] OIT network maintenance January 7 from 1:00 am – 6:00 am

The network maintenance scheduled for January 7 has been completed.

Thank you

Posted in Banner and Admin Systems, Educational Technologies, Email, Network and Telecom, Systems

OIT network maintenance January 7 from 1:00 am – 6:00 am

On Saturday, January 07, 2017, between 1:00 am and 6:00 am, OIT will implement an emergency update to the core network.  Due to the nature of the maintenance, users may experience intermittent network outages lasting approximately 20 – 30 minutes during this time period. This outage will affect connectivity to the Internet as well as connectivity within FAU.

Thank you

Posted in Banner and Admin Systems, Educational Technologies, Email, Network and Telecom, Systems

[COMPLETED] – Touchnet Maintenance (student payment services), Wednesday, Dec 21 3:00AM to 7:00AM

** MAINTENANCE COMPLETED **

TouchNet systems will be undergoing routine maintenance; from 3:00a.m. to 7:00a.m. on Wednesday 12/21/16.

All student payment services will be unavailable during this time.

 

Posted in Banner and Admin Systems, Systems

OIT Upgrade and Enhancement Schedule, Dec. 21 – 30

To minimize impact to our user community, the Office of Information Technology has planned several upgrades and enhancements during the upcoming holiday break. Please see the schedule below for dates, times and impacts.

Outstanding Maintenance

Wednesday, Dec. 28 through Friday, Dec. 30; each morning from 12:01 a.m. – 6 a.m.
Network Core Maintenance; expect intermittent network outages during this time period.

Completed Maintenance

Wednesday, Dec. 21, 6 p.m., through Thursday, Dec. 22, 6 a.m.  Datacenter Power Upgrades [Completed]

Monday, Dec. 26, 1 a.m. – 6 a.m:  Network Core Maintenance [Completed]

Monday, Dec. 26, 6 p.m. through Tuesday, Dec. 27, 6 a.m:  Banner Patches and Upgrades [Completed]

 

Posted in Banner and Admin Systems, Network and Telecom, Systems, Uncategorized

Registration is available again.

Registration (add or drop) is back up. We apologize for the inconvenience.

Posted in Banner and Admin Systems

OIT Systems Maintenance, Thurs. Nov 17 from 3:00AM to 7:00AM

Office of Information Technology will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deemed necessary, installing critical patches and other health checks on Thursday, 11/17/2016 from 3:00 AM to 7:00 AM during OIT maintenance window.  In addition, the following systems will be specifically impacted:

***************************************************
Oracle quarterly DB patches (boc22ora01)
When: 3:00AM – 7:00AM
Affected services: Report Caster and WebFOCUS production​
Affected systems: boc22ora01​
Description of maintenance:  Applying Oracle PSU to DB’s on host boc22ora01.​
User impact: Report Caster and WebFOCUS will be temporarily unavailable at times during ​the maintenance window.  Jobs may not execute in Report Caster.​

***************************************************
Oracle quarterly DB patches (boc22ora03)
When: 3:00AM – 7:00AM
Affected services: Identity Manager production and MSOP instance which houses miscellaneous schemas such as Owlapp, grouper, undergrad app, grad survey, lumsync, pwd expire, swift, frevvo, fau visitor​
Affected systems: boc22ora03​
Description of maintenance: Applying Oracle PSU to DB’s on host boc22ora03​
User impact: Applications that login to the MSOP or IDMP instances will become temporarily unavailable during the maintenance window

***************************************************
Oracle quarterly DB patches (boc22ora05)
When:  3:00AM – 7:00AM
Affected services: IEA Data Warehouse, Resource 25​
Affected systems: boc22ora05​
Description of maintenance: Applying Oracle PSU to DB’s on host boc22ora05.​
User impact: The IEA Data warehouse will not be available during this time.  The Resource 25 application will experience interruptions in service as well

***************************************************
Oracle quarterly DB patches (mcoracle)
When:  3:00AM – 7:00AM
Affected services: Luminis production (MyFAU)​​
Affected systems: mcoracle​
Description of maintenance: Applying Oracle PSU to DB’s on host mcoracle.​
User impact: MyFAU and Luminis will be come unavailable during the maintenance window.  Will have to coordinate with someone to restart these services once the database is back online.​

***************************************************
Migrate idm4p to oracle enterprise linux 6
When:  5:00AM – 6:00AM
Affected services: chessboard password reset tool
Affected systems: idm4p​
Description of maintenance: We are upgrading the operating system for a component of the chessboard tool (internal OIT use)
User impact: No end-user impact is expected

***************************************************

Posted in Banner and Admin Systems, Systems

Resolved – Wireless networks in Davie and Jupiter able to access SSO

Update: Jupiter and Davie campuses are now able to access SSO from the wireless networks.

Posted in Banner and Admin Systems, Educational Technologies, Email, Network and Telecom, Systems, Workday

OIT Systems Maintenance, Thurs. Nov 10 from 12:01AM to 7:00AM

Office of Information Technology will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deemed necessary, installing critical patches and other health checks on Thursday, 11/10/2016 from 3:00 AM to 7:00 AM during OIT maintenance window.  In addition, the following systems will be specifically impacted:

***************************************************

Migration of virtual servers to new BigIP load balancers (SSO)
When: 5:00AM – 6:00AM
Affected services: Single-Sign On (SSO)
Affected systems: Bigip Load Balancers
Description of maintenance: Our current BigIP load balancers are being upgraded, so we are moving secure websites hosted by the old ones to the new ones.
User impact:  SSO will be inaccessible for 5 minutes. (more than likely 5 seconds)

***************************************************

Migration of www and Myfau to the new BigIP load balancers
When:  5:00AM – 6:00AM
Affected services:  FAU website and MyFAU
Affected systems: BigIP Load balancers​
Description of maintenance:  ​Our current BigIP load balancers are being upgraded, so we are moving secure websites hosted by the old ones to the new ones
User impact: Users may experience a brief interruption while trying to access these websites

***************************************************

Oracle quarterly DB patches (bannerprd and odsprod)
When:  3:00AM – 7:00AM
Affected services: Banner and ODS production along with services that are tied to the these systems such as jobsub, appworx, dars, and cleanaddress​
Affected systems:  bannerprd, odsprod, sctcache1-7, sctforms-2​
Description of maintenance:  Applying Oracle PSU to DB’s on hosts bannerprd and odsprod​
User impact:  Users will be unable to login to Banner or ODS during the period the database is offline.  This should be no longer than 1 hour.​

***************************************************

Oracle quarterly DB patches (bbloracle)
When:  3:00AM – 7:00AM
Affected services:  Blackboard Production​
Affected systems:  bbloracle​
Description of maintenance: Applying Oracle PSU to DB’s on host bbloracle.​
User impact:  Blackboard will become temporarily unavailable during the maintenance window.​​

***************************************************

Oracle quarterly DB patches (boc22ora07)
When:  3:00AM – 7:00AM
Affected services:  Oracle Identity Manager production
Affected systems:  boc22ora07, boc22oimp1, boc22oimp2​
Description of maintenance:  Applying Oracle PSU to DB’s on host boc22ora07
User impact:  The OIM system will be unavailable for a short period.  During this time, account changes will not be processed and the self-service interface will be unavailable.​

***************************************************

Verasmart upgrade
When:  12:01AM – 2:00AM
Affected services:  phone billing​
Affected systems:  boc22comm1
Description of maintenance: Upgrading verasmart software​
User impact:  no phone billing during this time​

***************************************************

Posted in Banner and Admin Systems, Network and Telecom, Systems

[CANCELLED] – OIT Systems Maintenance, Thurs. Nov 3 from 12:01AM to 7:00AM

***UPDATE***

Maintenance for Thursday, Nov 3 has been postponed until next Thursday.

*****************************************

 

Office of Information Technology will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deemed necessary, installing critical patches and other health checks on Thursday, 11/03/2016 from 12:01 AM to 7:00 AM during OIT maintenance window. In addition, the following systems will be specifically impacted:

***************************************************

Oracle quarterly DB patches (mcoracle)
When: 3:00AM to 7:00AM
Affected services: Luminis production (MyFAU)​​
Affected systems: mcoracle
Description of maintenance: Applying Oracle PSU to DB’s on host mcoracle
User impact: MyFAU and Luminis will be come unavailable during the maintenance window.

***************************************************

Oracle quarterly DB patches (boc22ora05)
When: 3:00AM to 7:00AM
Affected services: IEA Data Warehouse, Resource 25​
Affected systems: boc22ora05​
Description of maintenance: Applying Oracle PSU to DB’s on host boc22ora05.​
User impact: The IEA Datawarehouse will be unavailable during this time. The Resource 25 application will experience interruptions in service as well.

***************************************************

Oracle quarterly DB patches (boc22ora03)
When: 3:00AM to 7:00AM
Affected services: Identity Manager production and MSOP instance which involves Owlapp, grouper, undergrad app, grad survey, lumsync, pwd expire, swift, frevvo, fau visitor​
Affected systems: boc22ora03​
Description of maintenance: Applying Oracle PSU to DB’s on host boc22ora03​
User impact: Applications that login to the MSOP or IDMP instances will become temporarily unavailable during the maintenance window.​

***************************************************

Oracle quarterly DB patches (boc22ora01)
When: 3:00AM to 7:00AM
Affected services: Report Caster and WebFOCUS production​
Affected systems: boc22ora01​
Description of maintenance: Applying Oracle PSU to DB’s on host boc22ora01.​
User impact: Report Caster and WebFOCUS will be temporarily unavailable at times during ​the maintenance window. Jobs may not execute in Report Caster.

***************************************************

Migration of virtual servers to new BigIP load balancers (SSO)
When: 5:00AM to 6:00AM
Affected services: SSO
Affected systems: Bigip Load Balancers
Description of maintenance: Our current BigIP load balancers are being upgraded, so we are moving secure websites hosted by the old ones to the new ones.
User impact: SSO may be inaccessible for up to 5 minutes.

***************************************************

Migration of www and Myfau to the new BigIP load balancers
When: 5:00AM to 6:00AM
Affected services: ​FAU website and MyFAU
Affected systems: BigIP Load balancers​
Description of maintenance: Our current BigIP load balancers are being upgraded, so we are moving secure websites hosted by the old ones to the new ones.
User impact: Users may experience a brief interruption while trying to access these websites

***************************************************

Disk maintenance on several systems
When: 3:00AM to 6:00AM
Affected services: Test Blackboard, Metadata Management for Middleware Services, OIT App Dev server, Test Talisma, WildFly Application Server for Middleware Identity Management (Dev, Test and Prod), Gitlab for OIT App Dev team, LDAP​, ADFS, Jira Test​
Affected systems: boc22l6jirat, ldapnw1-el6, ldapboc1-el6, ldapboc0-el6, shibidp1t, bblt3sp10, bblt2sp10, bblt1sp10, bbda2, bbda1​, metadata, boc22devproc, boc22taldev1, gitlab, wildflymc1d, wildflymc1t, wildflymc1, wildflymc2, wildfly3, wildfly1t, wildfly1d, boc22adfs
Description of maintenance: OIT will be shutting down several systems to preform disk maintenance
User impact: The services mentioned above will be unavailable intermittently during the maintenance window

***************************************************
Verasmart phone billing upgrade
When: 12:01AM – 2:00AM
Affected services: phone billing​
Affected systems: boc22comm1
Description of maintenance: OIT will be upgrading verasmart phone billing software​
User impact: Phone billing will be unavailable during this time​

***************************************************

Posted in Banner and Admin Systems, Educational Technologies, Email, Systems