[Completed] Network upgrades in buildings 01, 12, 55, and 73 on May 9, 2018

The network upgrades scheduled for Wednesday, May 9, 2018 have been completed. The following buildings were successfully upgraded: Sanson Life Science (01) Behavioral Sciences (12) Physical Science (55) and General Classroom North (73.)

Thank you

Posted in Network and Telecom