OIT Systems Maintenance, Thurs. Nov 15 from 3:00AM to 7:00AM

Office of Information Technology will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deemed necessary, installing critical patches and other health checks on Thursday, 11/15/2018 from 3:00 AM to 7:00 AM during OIT maintenance window.  In addition, the following systems will be specifically impacted:

*************************************************************************************
Account Self Service
Description of change:  OIT will upgrade the Account Self-Service portal to correct a problem related to updating your password while logged in.
Downtime window start: 5:00 AM
Downtime window end: 6:00 AM
Affected services: accounts.fau.edu
Affected systems: OIM Web servers
Expected End-user impact: During this time, account self-service portal will be unavailable. After the change, users will be able to correctly change their password when logging in to the Account Self-Service portal.

*************************************************************************************
DPM – Software upgrade
Description of change: OIT is upgrading all of the production DPM servers from UR4 to UR6.
Downtime window start: 3:00 AM
Downtime window end: 7:00 AM
Affected services: Backups for production VMs and physical desktops using DPM as their backup method.​
Affected systems:  SCDPM, boc22dpmus, nwdpmus. All client agents managed by these 3 servers.​
Expected End-user impact:  During this time, backups will be paused at various times between 3AM and 7AM.​

*************************************************************************************
Server and Client Maintenance
Description of change: OIT will be upgrading server and client software for the Event Management Software suite.
Downtime window start: 3:00 AM
Downtime window end: 5:00 AM
Affected services: EMS
Affected systems: Servers related to EMS
Expected End-user impact:  During this time, there will be minimal end user-impact. End users will need to relaunch their desktop clients when they come into the office.

*************************************************************************************
Banner Maintenance
Description of change: OIT will apply 25Live/LYNX upgrade scripts for the Registrar’s office in Banner production.
Downtime window start: 5:00 AM
Downtime window end: 7:00 AM
Affected services: No impact on running services.  This will enable a new application to interface with Banner.
Affected systems: Banner production
Expected End-user impact: During this time, no end-users impact on is expected.

************************************************************************************
SecureDoc Server Updates
Description of change: OIT will be updating the SecureDoc Enterprise software on the host VM.
Downtime window start: 5:00 AM
Downtime window end: 7:00 AM
Affected services: SecureDoc autoboot will be down sporadically during restarts.
Affected systems: SecureDoc Server
Expected End-user impact: During this time, no end-user impact is expected. The only issue would be that machines would not be able to autoboot during server restarts. The user would still be able to log in manually.

*************************************************************************************
DC VLAN Moves Phase 3
Description of change: OIT will be moving Data Center Vlans to the new DC01 core for service to Data Center Servers and ToR devices.
Downtime window start: 5:00 AM
Downtime window end: 6:00 AM
Affected services: Services hosted on the servers on these subnets.
Affected systems: DataCenter Devices
Expected End-user impact: During this time, services on these server subnets will be disrupted during the move. ​

*************************************************************************************

Posted in Banner and Admin Systems, Email, Network and Telecom, Systems