OIT Systems Maintenance, Thurs. March 18 from 3:00AM to 7:00AM

Office of Information Technology will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deemed necessary, installing critical patches and other health checks on Thursday, 03/18/2021 from 3:00 AM to 7:00 AM during OIT maintenance window. In addition, the following systems will be specifically impacted:

*************************************************************************************
FreeIPA Configuration Change
Downtime window start: 3/18/2021 5:00 AM
Downtime window end: 3/18/2021 6:00 AM
Affected services: HPC Clusters: kokosec and koko​
Expected End-user impact: No impact is anticipated. We have profiles enabled that will allow users to login to services they are authorized to.

*************************************************************************************
ESXI updates BHRIC
Downtime window start: 3/18/2021 6:05 PM
Downtime window end: 3/23/2021 7:00 AM
Affected services: ​vhealth, BHRIC VDI
Expected End-user impact: There should be no interruption of service. However, some virtual machines may experience slower performance until the host comes back online and re-balances the virtual machines.

*************************************************************************************

Posted in Research Computing, Systems