The WebFOCUS production box was stopped at 12:15 am this morning and was restarted again at 8:23 am. ReportCaster is currently runing all scheduled jobs that were not run during this period.
The WebFOCUS production box was stopped at 12:15 am this morning and was restarted again at 8:23 am. ReportCaster is currently runing all scheduled jobs that were not run during this period.
The phone service to Henderson and the Karen Slattery Center has been restored.
The problem with the Xpressions (voicemail) system has been resolved.
We are currently experiencing a problem with the Xpressions (voicemail) system. We are working to resolve the issue and the vendor has been notified
The copper cable feeding the phone service to the Henderson and the Karen Slattery Center has been cut. Jade Communications is onsite with the Contractor accessing the situation.
IRM will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deemed necessary, installing critical patches and other health checks on Thursday, 10/27/2011 from 3:00 AM to 7:00 AM during IRM maintenance window.
The telephone switch in T-6 servicing the FAU Police are up and operational.
Ivette Puga, Manager Technical Services Florida Atlantic University – CSI 777 Glades Road, Bldg 22, Room 166 Boca Raton, FL 33431 561.297.2555 ipuga@fau.edu
An telephone outgage has occurred in the T-6 area affecting the Police Department. Siemens has been called and an FAU Technician has been dispatched.
The power and network have been restored to the East side of the Boca Raton Campus.
Thank you
—–Original Message—– Sent: Friday, October 21, 2011 11:40 AM
IRM Status has posted a new item, ‘Power outage East Side of Boca Campus’
There is a power outage on the east side of Boca Campus. Network equipment in the following buildings is offline.
Henderson School, Slattery Child Care, Student Village Apartments, Baldwin House
Physical Plant has been notified and is working on the power issue. Network will be restored when power comes back on.
You may view the latest post at http://wordpress.fau.edu/irm/2011/10/power-outage-east-side-of-boca-campus/
You received this e-mail because you asked to be notified when new updates are posted.
Best regards, IRM Status
There is a power outage on the east side of Boca Campus. Network equipment in the following buildings is offline.
Henderson School, Slattery Child Care, Student Village Apartments, Baldwin House
Physical Plant has been notified and is working on the power issue. Network will be restored when power comes back on.