Banner patch installation

Position Control patch 8.8.0.2 has been installed in Banner production (FAUP) this morning.

Posted in Network and Telecom

OIT Systems Maintenance, Thurs. April 4, from 3:00am to 7:00am

Office of Information Technology will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deemed necessary, installing critical patches and other health checks on Thursday, 04/04/2013 from 3:00 AM to 7:00 AM during OIT maintenance window.  In addition, the following systems will be specifically impacted:

When: 3:00 – 3:15 AM
Affected Systems: boc22cm102srv1, boc22cm102srv10, boc22cm102srv4, boc22cm102srv10, boc22cm102vrt101mrtg, boc22cm102wcs10, cosweb1, jobs.finaid, ls-osd, ls-snap, ls-spss, printonline, remotecon, remotecon2, sqltesthost01, vcboc01, vcboc02, wsus
Groups Involved:  Systems
Description of Maintenance:  These systems are being reconfigured to allow them to move between hosts with different processors
User Impact:  The following services will be unavailable between 3 and 3:15AM:
 What’s Up server (for networking group)
 Cisco wireless control system
 College of Science web server
 Finaid website
 Labs new licensing servers for SNAP,SPSS,OSD
 Labs new print online system
 vCenter services for Systems group
 wsus services for Systems group

When: 3:00 – 6:30 AM
Affected Systems: bba2, bba5, bbm1, ieadata, ieaweb, nsboc1, pinky, r25-webservice, flashgordon, idm2, ldapboc0, spwfe1, talapp01, talonx1
Groups Involved:  Systems
Description of Maintenance:  These systems are being migrated to different host hardware
User Impact:  The following services will be unavailable for approximately for 30 to 60 minutes during the window:
 IEA website
 SharePoint
 Crestron RoomView
 Signature System website
 IEA and Talisma outgoing email distributions
 Talisma

When: 3:00 am – 7:00 am
Affected services: Position Control 8.8.0.2 patch, HR/Payroll 8.8.1.8, 8.8.1.9, 8.8.1.10 & 8.8.1.11 patches
Affected systems: Banner FAUP
Description of maintenance: The following updates will be installed in Banner production:
Position Control 8.8.0.2 patch & HR/Payroll 8.8.1.8, 8.8.1.9, 8.8.1.10 & 8.8.1.11
User impact: There will be no user impact.

Posted in Uncategorized

DEVL, TEST & ODST unavailable

Banner DEVL & TEST and ODST will be unavailable Tuesday 4/2/2013 from 6:00pm to 10:0pm in order to install firmware updates to the banoradev and odstest servers.

Posted in Banner and Admin Systems

RESOLVED – Lists.fau.edu (Sympa) not sending messages

Lists.fau.edu (Sympa) is currently not sending out messages. We are working to resolve this issue.

We apologize for the inconvenience.

OIT

Posted in Network and Telecom

FAU VPN Issue – Resolved

The issue with logging into the FAU VPN has been resolved

_______________________________

Posted in Uncategorized

[Resolved] VM migration taking longer than expected for lintalon0, flashgordon, dhcpboc0

[Update 8:27] All services are operational now

 

The following systems are currently unavailable as their migration operations are taking longer than expected:

lintalon0

flashgordon

 

dhcpboc0

The affected services are:

outgoing email distributions for IEA and Talisma (flashgordon)

sso.fau.edu and all sites which use CAS authentication (Google Apps, lists.fau.edu, Phone Bill, Network Registration, etc.)

We expect these systems to return to service within the hour.

[Update 8:05AM] – flashgoron has returned to service. We expect lintalon0 and all sso affected services to be available in the next 20 minutes

Thank you,

Systems

Posted in Uncategorized

OIT Systems Maintenance, Thurs., March 28, from 3:00 am to 7:00 am

Office of Information Technology will be performing routine systems maintenance which includes but is not limited to rebooting Windows servers as deemed necessary, installing critical patches and other health checks on Thursday, 03/28/2013 from 3:00 AM to 7:00 AM during OIT maintenance window. In addition, the following systems will be specifically impacted:

When: 3:00 AM – 7:00 AM
Affected services: Banner – General 8.5.2.5 patch, Position Control 8.8.0.2 patch, HR/Payroll 8.8.1.9, 8.8.1.10 & 8.8.1.11 patches
Affected systems: Banner FAUP
Description of maintenance: The above mentioned Banner modules will be installed to the specified version in production FAUP.
User impact: There will be no user impact.

When: 3:00 – 3:15 AM
Affected Systems: acsmem01, acsmem02, acsmem04, adcon, aptitudesrv, as5, controller, ecswins01, ecswins02, exchangeca03, fauappsrv1, fauweb2, fauwebdev, finaid, freeze, iss, issdev, issprod, ls-matlab, ls-minitab
Groups Involved: Systems
Description of Maintenance: These systems are being reconfigured to allow them to move between hosts with different processors
User Impact: The following services will be unavailable between 3 and 3:15AM:
VPN authentication
Adcon (remote desktop services)
Aptitude Website
Labs new fileserver
WINS services
SMTP and IMAP for Exchange
Fauweb2 website
Financial aid website
ISS website
Labs matlab and minitab licensing servers
Labs new deep freeze server
Controller’s new website

When: 3:00 – 6:00 AM
Affected Systems: bba1, bba2, bba5, bba6, bbm1, ieadata, fauappsrv2, ibiweb, ieaweb, nsboc1, octopus, pinky, piwik1, r25-webservice, dnsboc0, dhcpboc0, ldapboc0, lintalon0, flashgordon, spwfe1, spapp1, idm1, owlapp1
Groups Involved: Systems
Description of Maintenance: These systems are being migrated to different host hardware
User Impact: The following services will be unavailable for approximately for 30 to 60 minutes during the window:
IEA website
Web proxying through octopus
Ibiweb website (WebFOCUS and ReportCaster)
SharePoint
Crestron RoomView
Signature System website
IEA and Talisma outgoing email distributions

Posted in Educational Technologies

DEVL & TEST INB maintenance

DEVL & TEST INB (Banner Forms) will be unavailable on Tuesday 3/26/2013 from 6:00pm – 10:00pm in order to install an Oracle Forms patch.

Posted in Uncategorized

Completed Network Maintenence Bldg 8W Student Health Services

The Network maintenance in Bldg. 8W has been completed.

Starting Monday 3/18 Networking Department will be upgrading the network equipment in building 8W the Student Health Services building. The work will be done from 5:00am to 7:00am daily until all interface ports have been moved to the new equipment. All work will be completed by Friday 3/22. This does not affect the PCI network.

Posted in Uncategorized

ldapboc1 is currently unavailable – no services affected

We are experiencing an issue with ldapboc1. ldapboc0 has assumed its duties until ldapboc1 can be brought back online. We expect no interruption in service.

Thank you

Posted in Uncategorized
Calendar
August 2026
M T W T F S S
 12
3456789
10111213141516
17181920212223
24252627282930
31