On September 30 and October 1 between 3:00AM and 7:00AM, the Banner system will be unavailable in order for OIT to install regulatory releases.
*************************************************************************************
Banner 8X/XE Financial Aid pre-requisite upgrades/patches/administrative pages (Group 1)
Description of change: The Financial Aid office require several Ellucian releases installed (as pre-requisite items) for the upcoming Regulatory releases required to keep FAU in compliance.
Downtime window start 9/30/2020 3:00 AM
Downtime window end 9/30/2020 7:00 AM
Affected services: BANNER 8X/XE
Expected End-user impact: During this time, the Banner system will be brought down during the actual installation of the code.
*************************************************************************************
Banner 8X/XE Financial Aid pre-requisite upgrades/patches/administrative pages (Group 2)
Description of change: The Financial Aid office require several Ellucian releases installed as pre-requisite items for the upcoming Regulatory releases required to keep FAU in compliance.
Downtime window start: 10/1/2020 3:00 AM
Downtime window end: 10/1/2020 7:00 AM
Affected services: BANNER 8X/XE
Expected End-user impact: During this time, the Banner system will be brought down during the actual installation of the code.
*************************************************************************************